Road Report - getting to & from Kruger

How to get there, road updates
User avatar
Pumbaa
Posts: 8228
Joined: Wed Jun 06, 2012 8:53 pm
Contact:

Re: Road Report - getting to & from Kruger

Post by Pumbaa »

Richprins wrote: Fri Feb 04, 2022 10:28 am Yes there will still be roadworks on the N4 before Malelane, Pumbaa! :-(

But often it is not much of a holdup! 0()
Thanks - last year we were held up quite long :O^


PuMbAa

Please visit our website: www.photomaniacs.de
User avatar
Pumbaa
Posts: 8228
Joined: Wed Jun 06, 2012 8:53 pm
Contact:

Re: Road Report - getting to & from Kruger

Post by Pumbaa »

harrys wrote: Fri Feb 04, 2022 10:32 am
Pumbaa wrote: Thu Feb 03, 2022 9:10 pm Hi,

when everything will go well we will be on our way to Kruger next Thursday. Are there still road works on the N4 into the direction from OR Tambo to Malelane?

And any hint for an alternative exit gate than Punda Maria as last year we had the pleasure in being held up by a community protest which we for sure want to avoid another time. Our last camp would be Shingwedzi.

Thanks so much for your help here \O
You can exit at Phalaborwa gate \O
Thanks - We already thought of that too \O


PuMbAa

Please visit our website: www.photomaniacs.de
User avatar
mposthumus
Posts: 953
Joined: Thu May 31, 2012 9:51 pm
Country: South Africa
Location: Pretora
Contact:

Re: Road Report - getting to & from Kruger

Post by mposthumus »

Hi All 0/*

Anyone know the current condition of the Dullstroom/Lydenburg/Sabie road to Kruger Gate please?

0() IO

  


User avatar
Richprins
Committee Member
Posts: 75079
Joined: Sat May 19, 2012 3:52 pm
Location: NELSPRUIT
Contact:

Re: Road Report - getting to & from Kruger

Post by Richprins »

0/* 'possie!

I don't think many of us go there, but have seen recent reports that say despite potholes the Dullstroom-Lydenburg road is much better, and the Long Tom pass is fine besides trucks.


Please check Needs Attention pre-booking: https://africawild-forum.com/viewtopic.php?f=322&t=596
User avatar
mposthumus
Posts: 953
Joined: Thu May 31, 2012 9:51 pm
Country: South Africa
Location: Pretora
Contact:

Re: Road Report - getting to & from Kruger

Post by mposthumus »

:ty: RP, appreciate :-0


User avatar
Richprins
Committee Member
Posts: 75079
Joined: Sat May 19, 2012 3:52 pm
Location: NELSPRUIT
Contact:

Re: Road Report - getting to & from Kruger

Post by Richprins »

Rain-damaged R40 near Klipkopjes being repaired
The road will not be closed during the construction. A detour is being added to allow motorists to use the road.
19 hours ago
Tumelo Waga Dibakwane


Image



The construction equipment on the R40 to repair the damaged section. > Photo: Tumelo Waga Dibakwane

Finally. A contractor is on-site to start with the long-awaited repairs on the large hole on the side of the R40 near Klipkopjes Dam.

Sanral Northern Region’s project manager, Tony Seloana, said the contractor had faced some challenges with establishing a project liaison committee (PLC) and the awarding of subcontracting work packages.

“The matter was resolved, a PLC was appointed and all challenges were addressed. The good news is that the contractor is on-site, busy with the repairs. However, we cannot give a time frame for completion of the work due to the ongoing rains.”

Seloana urged motorists to drive with caution when approaching the area, and to be patient.


For the past two years the road has been operating on a stop-and-go basis, although the contractor is adding a detour right next to the R40 until the work is complete.

It is still unclear as to what will happen to the detour after that, and currently there is no timeline for when it would be functional.
Sanral has set aside about R40m for the road’s rehabilitation.

This gap in the busy R40 near Klipkopjes Dam, which was caused by floods in February 2023, was not the only damage in the area.

The severe storm caused widespread destruction to infrastructure, houses, roads, schools and healthcare facilities.


The assessment of these damages was completed in April 2023 and it was estimated that R2.3b was needed to do all the repairs across Mpumalanga.

The provincial Department of Co-operative Governance and Traditional Affairs applied for funding from the National Disaster Management Centre, which in turn said it only had limited funds available and it would only go as far as assisting some local municipalities to repair infrastructure damage, including roads.

Sanral took over to repair the damaged part of the R40, while the Department of Public Works, Roads and Transport undertook to repair roads such as the R536 between Hazyview and Sabie and the R40 between Barberton and the Josefsdal Border Post.

SNA Construction, Kgarebana Civil and Structural Engineers, and White Hazy Construction have been appointed to undertake the R40 repairs.

In terms of job creation, the construction target is to employ between 20 and 30 people, which would include a minimum of six to nine young people, at least six to nine women and one person living with a disability.

The contractors have also undertaken to spend more than R50 000 on community development projects.

https://www.citizen.co.za/lowvelder/new ... -repaired/


Please check Needs Attention pre-booking: https://africawild-forum.com/viewtopic.php?f=322&t=596
User avatar
Lisbeth
Site Admin
Posts: 65584
Joined: Sat May 19, 2012 12:31 pm
Country: Switzerland
Location: Lugano
Contact:

Re: Road Report - getting to & from Kruger

Post by Lisbeth »

Two years before getting to work :X:


"Education is the most powerful weapon which you can use to change the world." Nelson Mandela
The desire for equality must never exceed the demands of knowledge
User avatar
Richprins
Committee Member
Posts: 75079
Joined: Sat May 19, 2012 3:52 pm
Location: NELSPRUIT
Contact:

Re: Road Report - getting to & from Kruger

Post by Richprins »

Tenders, bribes and kickbacks have to be done first, Lis, and lately community extortion is also a fee... :evil:


Please check Needs Attention pre-booking: https://africawild-forum.com/viewtopic.php?f=322&t=596
User avatar
Lisbeth
Site Admin
Posts: 65584
Joined: Sat May 19, 2012 12:31 pm
Country: Switzerland
Location: Lugano
Contact:

Re: Road Report - getting to & from Kruger

Post by Lisbeth »

community extortion
:shock: :-?


"Education is the most powerful weapon which you can use to change the world." Nelson Mandela
The desire for equality must never exceed the demands of knowledge
User avatar
Richprins
Committee Member
Posts: 75079
Joined: Sat May 19, 2012 3:52 pm
Location: NELSPRUIT
Contact:

Re: Road Report - getting to & from Kruger

Post by Richprins »

The Construction Mafia!


Please check Needs Attention pre-booking: https://africawild-forum.com/viewtopic.php?f=322&t=596
Post Reply